亚洲AV一二三四区,日本一区二区欧美,一级黄片久久久,色咪咪视频网站

您好,歡迎光臨濟(jì)南泉誼機(jī)械科技有限公司網(wǎng)站!

服務(wù)熱線(xiàn)

李經(jīng)理13695310799
熱門(mén)搜索:軍事模型 航天模型 飛機(jī)模型 坦克模型 變形金剛模型 鋼雕模型
您當(dāng)前所在位置 首頁(yè)>>新聞動(dòng)態(tài)>>公司動(dòng)態(tài)大型飛機(jī)模型的制作工藝流程

大型飛機(jī)模型的制作工藝流程

發(fā)布時(shí)間:2024-11-05 來(lái)源:http:///

 微信圖片_20201116101748   1、就是對(duì)大型飛機(jī)模型的方案設(shè)計(jì):這個(gè)主要是針對(duì)需要設(shè)計(jì)的客戶(hù),在大型飛機(jī)模型設(shè)計(jì)時(shí)要考慮它的環(huán)境,從而來(lái)確定它的內(nèi)容、形式、色彩等,設(shè)計(jì)出一套完整的大型變形金剛方案。

  1. Firstly, it is the scheme design for the large aircraft model: this is mainly aimed at the customers who need to design it. When designing the large aircraft model, their environment should be considered to determine its content, form, color, etc., and to design a complete set of large Transformers schemes.

  2、其次就是小稿制作: 復(fù)雜或者大型的鐵藝變形金剛,需要根據(jù)方案進(jìn)行小稿制作,等小稿做好后再將小稿等比例放大,有的大型飛機(jī)模型作時(shí)需要設(shè)計(jì)主支架,這就得需要大型飛機(jī)模型制作師 傅清楚它所能承受的載荷、尺寸、外形等等情況;

  2. Secondly, there is the production of small drafts: for complex or large wrought iron Transformers, small drafts need to be made according to the plan. After the small drafts are completed, they can be scaled up proportionally. Some large aircraft models require the design of a main bracket, which requires the master of the large aircraft model to be clear about the load, size, shape, and other conditions it can withstand;

  3.、然后就是翻模:將稿翻制成硬材料模具,一般用的都是小模具;

  3. Then comes the flipping process: turning the draft into a hard material mold, usually using small molds;

  4、接下來(lái)就是模型表面噴漆:根據(jù)需求為飛機(jī)模型上不同的顏色;

  4. Next is the surface painting of the model: different colors will be applied to the aircraft model according to the requirements;

  5、再然后就是鍛造成型:根據(jù)模具鍛造成完整的鐵藝模型,對(duì)雕塑進(jìn)行多次打磨,然后對(duì)其進(jìn)行表面處理;

  5. Next is forging: forging a complete iron model according to the mold, polishing the sculpture multiple times, and then surface treating it;

  6、后一步就是安裝:一般為焊 接,較牢固,即模型本身的骨架與基座上預(yù)埋鐵焊 接,預(yù)埋鐵下邊焊 接鋼筋,根據(jù)模型的尺寸來(lái)確定鋼筋的長(zhǎng)度以及預(yù)埋鐵的大小。

  6. The next step is installation: usually welding, which is more secure, that is, welding the skeleton of the model itself to the embedded iron on the base, welding steel bars under the embedded iron, and determining the length of the steel bars and the size of the embedded iron according to the size of the model.

  根據(jù)具體情況結(jié)合水泥、大理石等材料安裝裝飾,安裝方面由客戶(hù)提供吊車(chē)、鉸手架、水泥等。我公司派專(zhuān) 業(yè)安裝人員將變形金剛模型安裝到位。

  Install decoration based on specific conditions and materials such as cement and marble. The customer will provide cranes, articulated frames, cement, etc. for installation. Our company dispatched professional installers to install the Transformers model in place.

  本文來(lái)自:大型飛機(jī)模型更多精彩內(nèi)容請(qǐng)點(diǎn)擊我們的網(wǎng)站:http://我們將傾情為您解答。

  This article is from: Large Aircraft Models. For more exciting content, please click on our website: http:// We will wholeheartedly provide you with answers.

-